Scope demand
Assess users, dwell times, routes, bays and expected fleet growth.
A useful charging plan considers vehicle use, dwell times, charger numbers, access, payment requirements and the electrical capacity available at the premises.
Energy Geeks can help define the requirement and introduce relevant specialists. Installation recommendations remain subject to a technical site assessment.
Charging project pathway
Assess users, dwell times, routes, bays and expected fleet growth.
Review electrical capacity, civils, access and network implications.
Coordinate suitable specialists, commissioning and ongoing support.
Get a quote
We’ve selected the service for you. Answer a few focused questions and choose how you’d like an adviser to follow up.
Workplace and fleet charging
A practical charging project begins with vehicles, dwell times and electrical capacity, not simply a target number of chargepoints.
Staff cars, operational fleets, visitors and public users have different charging patterns. Vehicle mileage, return-to-base times, parking duration and future fleet growth help determine how many bays are needed and whether AC destination charging or faster DC charging is appropriate.
Access control, payment, reimbursement and back-office reporting should be considered early. A workplace-only scheme can have very different software and operational requirements from a customer-facing or publicly accessible site.
The existing supply must support the proposed chargers alongside the site's normal peak demand. A load assessment can identify spare capacity, the benefit of managed charging and whether the agreed kVA or network connection may need to change.
Dynamic load management can distribute available power between chargers, but it does not remove every capacity constraint. Larger schemes may require a network application, reinforcement, a new connection or coordination with other planned electrical loads.
A complete project can involve surveys, electrical design, civils, hardware, network communications, commissioning and signage. Landlord consent, parking rights and accessibility should be resolved before firm installation dates are promised.
Warranty, fault response, software fees and charger uptime affect the long-term cost of ownership. Grants and tax treatment can change, so current eligibility should be checked on GOV.UK rather than assumed from an older proposal.
Questions and answers
That depends on vehicle numbers, dwell times, charging speed, site access and growth plans. A site assessment is normally required.
The site's available capacity must be checked against existing and proposed demand before an installation recommendation is made.
It depends on vehicle battery size, daily mileage and dwell time. Vehicles parked for a working day may not require the same power as a rapid-turnaround fleet.
It can reduce simultaneous demand and may help some sites, but the existing supply and proposed peak load still need a proper assessment.
Not always. The right arrangement depends on billing, access, reporting, landlord requirements and the site's electrical design.